# Improving Live Dealer Stream Availability

> TechSupport Team supported StudioLive’s WebRTC and GStreamer live-dealer platform across three studios. Over six months, client Datadog monitoring recorded stream availability rising from 99.90% to 99.99%. Grafana showed fewer failed stream starts.

- Publisher: TechSupport Team
- Canonical page: https://techsupport-team.com/case-studies/live-dealer-streaming-reliability/
- Updated: 2026-11-16

Client: StudioLive · iGaming & Betting · Latvian live-dealer casino streaming

## Client and engagement facts

- **Client:** StudioLive
- **Industry:** iGaming & Betting
- **Business context:** Latvian live-dealer casino streaming
- **Delivery model:** Managed reliability engineering
- **Application:** Live-dealer casino streaming platform
- **Supplied geography:** Latvian

## Application stack and tools

### Application stack

- WebRTC
- GStreamer
- Kubernetes
- GCP

### Tools used

- Datadog
- Grafana
- PagerDuty

Related services: [DevOps support](https://techsupport-team.com/services/devops-support/)

## Why Support Was Needed

The operator monitored whether each stream was up. Engineers needed codec-level telemetry to find quality issues before they reached the player queue. TechSupport Team covered the streaming pipeline while the client ran the studios.

## Technical Work

- Inserted GStreamer-level probes at every codec path.
- Built a per-stream health dashboard visible to dealers and ops alike.
- Ran chaos tests during scheduled downtime to validate rollback procedures.

## Representative Incident

A GStreamer upgrade broke two codec paths during testing in month three. The team caught the regression before production, rolled back the candidate upgrade and revalidated the codec paths over three weeks.

## Results and how they were measured

Table: Reported results and their measurement scope

| Metric | Baseline | Result | Units | Measurement window | Source and scope |
| --- | --- | --- | --- | --- | --- |
| Stream availability | 99.90% | 99.99% | % | 6 months | Client Datadog; Scope: The six-month availability comparison excludes one studio power outage. |
| Stream-start failures | 3.1% | 0.4% | % | 6 months | Client Grafana |
| On-call pages/week | 44 | 9 |  | 6 months | Client PagerDuty |

## Evidence and Limitations

The six-month availability comparison excludes one studio power outage. The table covers the streaming platform and its on-call activity.

## Streaming and Studio Ownership

StudioLive ran the physical studios. TechSupport Team handled incidents in the streaming pipeline and stream-start flow.

## Scope a Similar Engagement

Share the streaming stack and where studio operations hand incidents to the software team. [Request a support plan](https://techsupport-team.com/contact/) or explore [DevOps support](https://techsupport-team.com/services/devops-support/).

## Related pages

- [DevOps support](https://techsupport-team.com/services/devops-support/): The related service for this engagement.

## Contact

Request engineers from TechSupport Team or ask a question: https://techsupport-team.com/contact/
