Connector Contract Change Checklist
A partner may change a field or mapping while the API keeps returning success. The break appears later in exports, order acceptance or customer dashboards. Use the TechSupport Team connector contract checklist to identify who needs to approve a change and how to verify it across the full flow.
Suggested citation · TechSupport Team, “Connector Contract Change Checklist.” Version 1.0. Reuse under CC BY 4.0.
Copy the pre-release record
| Check | Evidence | Owner to name |
|---|---|---|
| Describe the contract change | Old and new field shape, when it changes, and examples covering empty and edge values | Connector owner |
| Identify consumers | ERP, OMS, EDI gateway, reports and tenants that depend on the field | Application and integration owners |
| Test mixed traffic | Representative old and new messages in a safe environment, including downstream behavior | Engineer and partner contact |
| Decide the rollout sequence | Which side accepts both formats, the change window and how to pause | Release or integration owner |
| Validate after the change | First successful order or feed on both sides, rejection count and open exceptions | Support or operations owner |
Blank connector change checklist
# Connector Contract Change Checklist
By TechSupport Team · Version 1.0 · CC BY 4.0
Source: https://techsupport-team.com/resources/connector-contract-change-checklist/
## Describe the contract change
Old and new field shape, when it changes, and examples covering empty and edge values
Owner:
## Identify consumers
ERP, OMS, EDI gateway, reports and tenants that depend on the field
Owner:
## Test mixed traffic
Representative old and new messages in a safe environment, including downstream behavior
Owner:
## Decide the rollout sequence
Which side accepts both formats, the change window and how to pause
Owner:
## Validate after the change
First successful order or feed on both sides, rejection count and open exceptions
Owner:
Worked example
A shipping partner changes where its shipment reference appears. Record both payload shapes and the tenants on the affected version. In staging, run a fixture with the old field and a fixture with the new field. Confirm that each fixture maps to the same intended OMS record. The change owner records when the partner will switch. After the change, support checks representative real records through the approved monitoring view.
Before retiring compatibility handling, review whether every relevant consumer has moved and what to do with late records. Document who can roll back and who can recover records routed during the transition.
Get help with your support queue
Source and reuse
Credit TechSupport Team and link to this page when sharing or adapting version 1.0 under CC BY 4.0.